Projects in Europe

» Swedish Environmental Research Institute

In May 2009, a Predect 300 system was installed at Hammarby Sjöstadsverk (“HSV”) in Stockholm.HSV is Sweden's leading and internationally reknown R&D facility in water purification technology. The facility contributes to profile and spread unique Swedish know-how related to water and environmental technology worldwide. Currently the Predect system is installed in a waste water reclamation line.

» Lilla Edet

In June 2009, another Predect 300 system was installed at the municipal water plant in Lilla Edet which supplies the local community of 9,000 people with water from a nearby river system. The project was concluded in January 2010.

» Motala

In August 2009, the Swedish Water and Wastewater Association (“SWWA”)—whose membership includes the 2000 municipal waterworks of Sweden—awarded Predect and partner Sweco a project at municipal water plant in Motala, Sweden. The project included two systems, one for monitoring incoming surface source water (Predect 100) and one for outgoing “finished” water (Predect 300).

» Arboga

In September 2009, Predect signed a trial contract with the municipal water plant in Arboga, Sweden. Arboga’s facility treats surface source waters with a special kind of sand filtration. In January 2010, Arboga signed Predect’s first commercial contract. The system has been running since November 2009.

» Vårgårda

Also in September of 2009, Predect signed a trial contract with a treatment facility in Vårgårda, Sweden. The setup is similar to Arboga, however Vårgårda is a ground water facility, which improves the variety of Predect’s reference cases. The project was concluded in December 2009.